Power System
Modular Data Center Solution
Improve service level and operational efficiency of power systems
电力系统
模块化数据中心解决方案
提高电力系统服务水平和经营效率
行业挑战
管理难集中
机房机柜统一部署,站点分布较广,巡检时间长,无法及时管理。
标准难统一
机房规模根据应用不同,等级不同,应用要求不同;建设模式无法形成统一标准。
维护难进行
专业运维人员缺乏,总是事后处理,无法保障各系统正常、稳定运行。
建设难及时
建设模式要求快速、便捷、高效。
行业挑战
管理难集中
机房机柜统一部署,站点分布较广,巡检时间长,无法及时管理。
标准难统一
机房规模根据应用不同,等级不同,应用要求不同;建设模式无法形成统一标准。
维护难进行
专业运维人员缺乏,总是事后处理,无法保障各系统正常、稳定运行。
建设难及时
建设模式要求快速、便捷、高效。
Industry Challenges
Centralized Management Difficulties
With racks deployed across wide sites, site inspections take long and real-time management cannot be achieved.
Unified Standards Hard to Achieve
Data centers vary in scale, grade and application requirements, making it difficult to unify construction standards.
Difficult Maintenance
Lack of professional maintenance staff leads to remedial handling only, which fails to guarantee stable operation of each system.
Industry Cases
Project case presentation of State Grid Heilongjiang (Shuangyashan) Electric Power Co., Ltd
Project Background
Construction of new office building of State Grid Heilongjiang (Shuangyashan) Electric Power Co., Ltd. The computer room serves as the new data room for State Grid (Shuangyashan) Power Dispatching & Control Center, with a construction area of 260 square meters.
Project Overview
1. Adopt DTCT modular computer room cold aisle products: 2 sets of double-row cold aisle modular data centers, 30 cabinets per set, total 60 cabinets including 4 power distribution cabinets. Main components include modular cabinets, aisle sliding doors, flip skylights, 18-position PDU power supplies, trays and brackets, cabinet grounding copper bars, etc.; 6 ordinary cabinets for supporting large screens in command & control center and small monitoring room.
2. Environmental monitoring system: DTCT provides complete power and environment monitoring products matching the modular cold aisle system.
Case presentation of the third phase of Zhejiang Energy Yueqing Power Plant project
Project Background
Zheneng Yueqing Power Plant Project is invested and constructed by Zhejiang Energy Group Co., Ltd. as a key project of Zhejiang Provincial Government. The plant is located in the area of Nanyue Town and Puqi Town on the west bank of Yueqing Bay, 20 km from Yueqing downtown and 40 km from Wenzhou. On June 13, 2023, Unit 6 of Phase III of Zheneng Yueqing Power Plant, a major project under Zhejiang's "Thousand Projects & Trillion Investment" Initiative, passed the 168-hour full-load trial operation and was officially put into service, marking the full completion and commissioning of Phase III.
Project Overview
This project adopts DTCT new-generation integrated modular micro data center products, including two sets of 10-in-1 units and one set of 3-in-1 unit, together with supporting power & environment monitoring software system.
Case Presentation of Guoneng Zhejiang Beilun No. 3 Power Generation Co., Ltd. Project
Project Background
Guoneng Zhejiang Beilun No.3 Power Generation Co., Ltd. was founded on December 31, 2006. It belongs to the power and heat production & supply industry. Its business scope covers power generation (operated within the validity period of license), construction of domestic thermal power plants and heat supply.
Project Overview
This project adopts DTCT new-generation full-range modular data center products, including 75 IT cabinets, 4 network wiring cabinets, 4 integrated power distribution cabinets and 10 in-row air conditioners to build 2 cold aisles of 1.2m width and 2.6m height (including skylight flip height), forming double-row cold aisle modular computer room. It is equipped with 12 sets of 50kVA modular power modules, 480 units of 200AH lead-acid batteries and 3 power distribution cabinets.
行业案例
国网黑龙江(双鸭山)电力有限公司项目案例展示
项目背景
国网黑龙江(双鸭山)电力有限公司新办公大楼建设,机房为国网(双鸭山)电力调度控制中心新址数据机房,机房建筑面积260平方米。
项目概况
1.采用DTCT德塔森特模块化机房冷通道产品:2组模块化数据中心双列冷通道产品,每组30台机柜,共计60台机柜,其中配电柜4台,其中主要部件包括模块化柜体、通道移门、翻转天窗、18位PDU电源、托盘及托架、柜体内接地铜排等;6台普通柜体,用于指挥控制中心大屏幕、小监控室的保障;
2、动环监控系统产品:德塔森特可提供完整的基础动力环境监控产品配合模块化冷通道系统。
浙能乐清电厂三期工程项目案例展示
项目背景
浙能乐清电厂工程是由浙江省能源集团有限公司控股投资建设,并被浙江省政府列为重点工程。厂址坐落于乐清市南岳镇和蒲岐镇区域内,乐清湾西岸,距乐清市中心20公里,温州市40公里。2023年6月13日,浙江省“千项万亿”重大工程——浙能乐清电厂三期工程6号机组通过168小时满负荷试运行,正式投运。至此,乐清电厂三期工程全面建成投产。
项目概况
该项目采用德塔森特新一代模块化微型数据机房一体机系列产品,包含两套十联机以及一套三联机;配套相应动环软件系统。
国能浙江北仑第三发电有限公司项目案例展示
项目背景
国能浙江北仑第三发电有限公司成立于2006年12月31日。所属行业为电力、热力生产和供应业,经营范围包含:发电(在许可证件有效期内经营)。 国内火力发电厂的建设,热力供应。
项目概况
该项目采用德塔森特新一代模块化数据中心机房全系列产品,包含75台IT设备柜,4台网络布线柜,4台综合配电柜,10台行间级空调组成2个1.2米宽冷池,2.6米高(含天窗翻转高度),模块化机房双列冷池;配置12台50kVA的模块化功率模块,480节200AH铅酸电池,3台配电柜等。
方案价值
灵活部署
根据数据量、业务系统不同,建设对应等级的机房、满足整体应用需求。
便捷维护
支持远程集中管控,实现垂直架构部署、统一管理。
高效管理
提升机房的整体维护设计,通过软件实现有效管理,减少巡检的无效性,提高巡检效率。
节能低碳
模块化建设、绿色节能、高效便捷。
Solution Value
Flexible Deployment
Build computer rooms of corresponding grades according to data volume and business systems to meet overall application requirements.
Easy Maintenance
It supports remote centralized control to realize vertical architecture deployment and unified management.
Efficient Management
Optimize the overall maintenance design of the computer room. Effective management is realized via software to eliminate unnecessary inspections and improve patrol efficiency.
Energy Saving & Low Carbon
Modular construction, green energy saving, high efficiency and convenience.
Power System Cooperation Cases